Clock-time corrections now happen where the office works. Based on customer feedback, the work order's Activities tab lets operations staff edit any crew activity directly from the CRM — adjust clock-in and clock-out times, breaks, the hourly rate, the activity itself, and the crew attached to it. Every change recalculates the billed amount instantly and syncs straight to the Crew App, so a mistyped clock-out or a crew member who joined mid-job no longer requires chasing the field crew to fix it from their device.
✨ What's New
- Edit from the Activities tab — each activity card in the work order's Activities → By Activities view now carries an edit action.
- Full activity editing — the Edit Activity dialog covers the activity name, number of workers, rate per hour, assigned workers, start and end times, break minutes (with total time computed live), and the billable flag.
- Two-way sync — saved changes update the activity's duration and billed amount in the CRM and reflect immediately in the Crew App.
- Finalization still locks the record — activities are editable until the work order is finalized in the Crew App; after that, they're locked in both the app and the CRM.
👥 Who This Is For
- Operations managers and office staff — who fix clock-in/out slips and rate corrections without routing them through the crew's device.
- Companies with crews that change mid-job — extra hands arriving two hours in can be added to the activity from the office, after the fact.
- Teams with staggered schedules — where a foreman starts early, drivers run port-to-port, and the rest of the crew works job start to end — activity records routinely need office-side adjustment.
- Payroll and billing — who need the activity hours and amounts right before the job is finalized and invoiced.
🧭 How to Use It
- Open the work order and go to the Activities tab → By Activities. Each activity card shows its crew, times, break, rate, and billed amount — click the edit (pencil) icon on the activity you need to correct.

- In the Edit Activity dialog, adjust whatever needs fixing — activity name, rate/hr, assigned workers (add or change crew), start and end times, break minutes, and the billable flag — and save. In this example, a Pack activity's rate moves from $150 to $160, the times shift from 1:17–2:17 to 1:30–2:30, and the break from 15 to 20 minutes.

- The CRM card updates instantly with the recalculated time and amount — here, 45 minutes at $150/hr ($112.50) becomes 40 minutes at $160/hr ($106.67).

- The same change lands in the Crew App automatically — before the edit…

- …and after, with the new times, break, rate, and total.

- Editing stays open until the crew taps Finalize Work Order in the app. Once finalized, the activity record is locked on both sides — in the Crew App and in the CRM.

🔎 Good to Know
- Works for clocked and manual activities alike. Whether the activity was clocked in the field or added manually (the Manual tag), it's editable from the CRM the same way.
- The math follows the edit. Billed time is the activity span minus breaks, at the activity's rate — change any of them and the amount recalculates on both the CRM and the app.
- Finalized means final. Once the work order is finalized in the Crew App, activities can't be edited anywhere — keeping completed timesheets and the amounts billed from them tamper-proof.
- Crew visibility is unchanged. Editing from the CRM doesn't alter what crews see in the app — pricing visibility continues to follow your Crew App permission settings.
🎉 Available Now
Activity editing is live on the work order's Activities tab. Fix the clock, add the crew, correct the rate — from the office, in seconds, synced to the field.